Spencer Bridge Engineering were awarded a contract by Torbay Council to construct a double bascule footbridge across the Torbay Harbour. The footbridge featured landmark ‘blades of light’ towers with iconic feature lighting and was part of a £21m regeneration project of Torquay’s Waterfront.
Client
Torbay Council
Duration
30 weeks
Location
Torquay
KEY STATISTICS
50M
pedestrian double bascule lifting bridge
Iconic
feature lighting
Cill & Tide
operating gates
PROJECT SCOPE
The contract involved the construction of impounding cill and tide operated gates across the harbour entrance to ensure the required depth of water is maintained at all tide stages to prevent moored vessels from grounding.
The 50m span double bascule lifting bridge included two reinforced concrete piers in the middle of the harbour dock and provided pedestrian access across the harbour and created a natural promenade route for visitors. The project formed part of a £21 million regeneration of Torquay’s Waterfront.
CAPABILITIES