Using its bespoke ‘cable crawler’ access gantry, Spencer Bridge Engineering installed a dehumidification system on the main cables of the Humber Bridge in Hull. The system injects dry air into the cables at multiple locations, helping to slow corrosion and extend the service life of the structure. Spencer Bridge Engineering were commissioned to undertake these works due to the success of our Forth Road Bridge and M48 Severn River Crossing projects.
Client
Humber Bridge Board
Duration
52 Weeks
Location
Kingston Upon Hull
KEY STATISTICS
24
Months of monitoring and maintenance
3/4
Gantry only used on ¾ other locations world wide
1
Only one lane closure required
PROJECT SCOPE
A key part of the process is the subsequent sealing of the cables with a proprietary material to create an air-tight environment.
The project scope included the design and installation of Spencer Bridge Engineering’s bespoke cable crawler access gantry system to facilitate safe and efficient access throughout the works. The scheme also involved the installation of a dehumidification system, followed by testing and commissioning activities to ensure full operational performance.
Given the nature of the structure and access requirements, the works involved significant operations at height, requiring specialist access solutions and careful planning throughout delivery.